Meridian immediately fails about change of pier side
A user reported that align process controlled by scheduler kicked in while meridian flip was still in progress. This resulted in failed alignment and subsequently, failed job. Part of the log with the important bits is attached. The flip starts but then mount module almost immediately report that pier side did not change.
Check the log, it appears the flip started at 2021-04-30T23:11:21.629 and completed at 2021-04-30T23:11:36.812
What caused mount module to report premature failure of the flip?