Bug: vidstab end result always cuts the clip length in half
STEPS TO REPRODUCE
- on a project bin clip do a videostab2 job
OBSERVED RESULT
The result stabilized clip always stops at half the length of the original one
EXPECTED RESULT
The result clip should take into account the length of the whole origin clip. Also it would be nice if the stabilized clips would be marked with a S on the original clip instead of adding a new one to the project bin. Similar to the way that proxied clips are marked. That would mean less clutter and would be a whole lot more intuitive.