Project bin: switching from audio clip to AV clip takes 6 seconds
STEPS TO REPRODUCE
- Load an audio and an AV clip into the project bin
- Switching between each clip.
OBSERVED RESULT
Switching from audio clip to AV clip takes 6 seconds. Switching from AV clip to audio clip takes 0 seconds.
EXPECTED RESULT
Switching from audio clip to AV clip takes 0 seconds.
Project_bin_-_Switchning_between_clips
ADDITIONAL INFORMATION
- compile 31c339ff and b20a7307 and update MLT -> Set monitor resolution to 1/2 or lower -> switching takes 10 sec now.
- Probably related to: #338 (closed)
- Maybe has something to do about clip size in the project bin and how Win7 and CPU encodes the clip. See test here https://invent.kde.org/kde/kdenlive/issues/480#note_23593
Edited by Eugen Mohr