Handle multi day events with the same logic as single day events

Multi day events are handled with the same -simplified- logic that the
single day events are handled.
1 job for master in 17 minutes and 19 seconds (queued for 1 minute and 16 seconds)
Status Job ID Name Coverage
  Build
passed #49139
flatpak
flatpak

00:17:19