Skip to content
  • Vlad Zahorodnii's avatar
    Schedule workspace repaint for destroyed clients · 12e59f9a
    Vlad Zahorodnii authored
    We need to schedule a workspace repaint in case no effect is going to
    animate the window.
    
    The workspace repaint is issued before creating a Deleted because the
    latter takes the owner of the effect window, which means that after an
    instance of Deleted has been created, visibleRect() returns the frame
    geometry.
    
    CCBUG: 425294
    12e59f9a